Meeting of an older Be4/4 with a double traction of two new Be units with Be 513 unit as front power
Double traction of two new Be units with Be 513 unit as front power passes the double line near Friesenberg station
New Be 513 together with a second Be unit passes the double line at Friesenberg.These trains are built for 1200 V DC (line S 10 Zürich HB to the Uetliberg) as well as for 15000 V 16,7 Hz AC (lin... (more)