Q692 heads northward along the Toe River, approaching the south end of Green Mountain siding. The mid-train DPU is visible across the bends in the river.
The DPU on N312, coal loads for Duke Energy's Cliffside Steam Station on the Brice Spur, pushes the 92 loads up the gentle but lengthy grade of the Blue Ridge Sub.