AMTK 108 in the "Phase VI" Heritage Scheme leads a Downeaster out of North Station. Just two weeks later the engine would catch fire while still on the Downeaster line.
Caboose in Cambridge
On the early morning of July 29th, 2024, the Northside Work Extra shoved through Cambridge with a string of MassDOT ballast cars in tow.
Arriving in Harvard set of 01800's built by Bombardier roll into the station. At one point this was the end of the red line until the Alewife extension in the 1980's was completed.
Cambridge Commuter Rail.
Massachusetts Bay Transportation Authority (MBTA) GP40MC no. 1128 (GMD, 1973-1975) is seen leading a northbound commuter train out of North Station, with the Za... (more)
Lechmeres. As MBTA 3815 (Type 8, Ansaldo-Breda, 1998-2007) made the stop at the new Lechmere Station in Cambridge, Massachusetts on January 14, 2023, careful framing brings the location of ... (more)