This 2-8-2, number 27, was built by the Baldwin Locomotive Works for the Cia. Ferroviaria Sao Paulo-Parana (Brazil). The total engine and tender weight was 207,950 lbs., and the tractive effort was 27,100 lbs. BLW construction number was 64,149. This Baldwin Locomotive Works builders photo card is from the John R. Doughty collection.
Dedicated to my father, John R. Doughty, Sr., and to his great uncle, Robert F. McKee, Sr., who worked at the Baldwin Locomotive Works as a senior design engineer, including working on the design for the Duluth, Missabe & Iron Range 2-8-8-4 Yellowstones