With two GP's tied on to the head end and final inspections made, a Buffalo & Pittsburgh extra gets ready to depart from Erie, Pennsylvania with a high & wide load of wind turbine nacelles bound for an unloading site in DuBois. These components were brought into the Port of Buffalo and loaded on to railcars, but due to bridge clearances between Buffalo and Johnsonburg could not take the direct BP routing. Instead, CSX moved them from Buffalo to Erie, where they were interchanged here at OD Yard to run across the A&E Sub before rejoining the main in Johnsonburg.