Durango & Silverton 480 charges through the tree tunnel at Milepost 483 with its mixed train on a cloudy May morning.
Durango & Silverton 480 leads its passenger train up the grade as it nears Rockwood on a sunny May afternoon.
Durango & Silverton 480 rolls down the grade at Needleton Siding with its mixed train on a cool May morning.
Durango & Silverton 480 creeps around the tight curves of The Highline with its mixed train early in the morning.
Durango & Silverton 480 leads its mixed train up the steep grade at Granite Point at sunrise on a beautiful May morning.
Durango & Silverton 480 navigates the tight curves of the Highline with its mixed train on a sunny May morning.
Durango & Silverton 480 leads its mixed train downgrade at Needleton on a cool May morning.
Durango & Silverton 493 rests on the Durango Turntable late at night before a long day of service the next day.
Durango & Silverton 480 and 473 rest in the Durango Roundhouse late at night as Frank Burton oils 480 to prepare it for its next day of service.
Durango & Silverton 476 arrives back in Durango late in the evening after completing its 90-mile round-trip journey to Silverton.
Durango & Silverton 480 rolls downgrade at Hermosa on a sunny spring evening.
Durango & Silverton 480 leads its mixed train upgrade at Cribbed Wall.
Durango & Silverton 473 and 480 charge out of Durango with a long passenger train bound for Silverton.
Durango & Silverton 480 crosses the High Bridge with its mixed train on a sunny May afternoon.