The new-generation high-speed comprehensive inspection train passed Dacheng Station.
The last non-air-conditioned commuter train pulled into the new downtown station
Anshan Iron and Steel Company's own locomotive EL1-17 pulled the freight train through the city.
Anshan Iron and Steel Company's own locomotive EL1-25 pulled the freight train through the city.
The “Changbaishan” EMU drove out of the EMU for the last time and went to Sujiatun for scrapping.
The high-speed comprehensive inspection train CRH380BJ-A-0504 headed for Shenyang North Railway Station
The high-speed comprehensive inspection train CRH380BJ-A-0504 passed through the city
The high-speed comprehensive inspection train CRH380BJ-A-0504 passed through the railway bridge.
Black clouds crush the city
0DJ55 headed for Shenyang North Railway Station
Walk through the city
The intersection of EMU and fast train
High-speed comprehensive inspection train CRH380BJ0301 crossesd the Dacheng Bridge
Train DJ455 will arrive at Shenyang Station
The train laden with ore stops at Donggang Station