Live load on a flat wagon of the loaded ore train from Zouérate/Fderîck to Nouadhibou. The 8 dromedaries are only a few minutes away from their destination after a journey of 15 to 18 hours.
The Lauterbrunnen-Mürren mountain railroad (BLM), which belongs to the Jungfraubahn Holding, consists of an aerial cableway from Lauterbrunnen to Grütschalp and a meter-gauge adhesion railroad a... (more)
On May 13, 2024, the second new Be 4/6 # 101 train was delivered by StadlerRail for the Lauterbrunen-Mürren mountain railroad, more precisely the adhesion line between Grütschalp and Mürren. At... (more)
On May 13, 2024, the second new Be 4/6 # 101 train was delivered by StadlerRail for the Lauterbrunen-Mürren mountain railroad, more precisely the adhesion line between Grütschalp and Mürren. Th... (more)
Here is a good look at the Department of Energy IDOX 010001 special heavyweight flat car designed to carry a container of spent nuclear fuel as it runs through Palmer Lake, Colorado in a BNSF trai... (more)