ATSF 677 E/B mixed freight climbing across bridge 7 in Abo Canyon on May 15, 1998 with BN 4013 & ATSF 146. Springtime in the canyon with a little water in the creek and the brush greening up.
BNSF 6253 (ES44AC) runs west on the Brush Sub through the Keenesburg Cut as it heads to Denver.
BNSF 6253 (ES44AC) drops into the sag west of Roggen, Colorado on the Brush Sub.
Sunflowers and other colorful wildflowers are in full bloom at Roggen, Colorado, as BNSF 6253 (ES44AC) runs west on the Brush Sub.
Fall Flowers are in Full Bloom Flowers are peak along the High Plains Route
BNSF 7829 (ES44DC) runs west on the Brush Sub towards Denver, Colorado.
Storm clouds start to form around the eastern slope of the Arizona Divide as a Phoenix, AZ to Willow Springs, IL descends down the grade through Darling.
A St. Louis, MO bound intermodal train climbs the grade towards Crozier Canyon as a monsoon storm to the east produces rain and lightning over the high desert of northwestern Arizona.
Summer in the San Joaquin Valley wispy blue sky's dry golden weeds and speeding eastbound Zs.
BNSF 7105 (ES44C4) runs a stack train through the cut in Akron, Colorado
UP 9643, 4748, & 5266 with a westbound mixed freight.
UP 7350, 7353, & 8762 with a westbound mixed freight.
BNSF 3907 (ET44C4) runs west on the Brush Sub through Hudson, Colorado.
A southbound BNSF train climbs through Russell, MN with three non-GEVO locomotives on the point, including a former Santa Fe GP60M. For July 2025, I'll take that as a win.