Sandaoling Mining Railway JS8225 storms up the last stretch of 2.5% grade before the summit at KengKouZhan. Soon this train will surmount the grade and coast downhill into the washery where it's l... (more)
In the pink light of a rising sun, JS8225 storms past JS8190 with the first coal train of the morning. These trains run like clockwork with a train around sunrise every morning throughout the wint... (more)
JS8081 makes a dramatic departure from the unloading point after dumping her train of coal. Over half of the coal trains at Sandaoling are unloaded at this coal yard where the coal is trans-loaded... (more)
Sandaoling Mining Railway JS8225 looks more like an American mainline 2-8-2 than a Chinese mining engine, as the massive Mikado storms upgrade on the double track Sandaoling Mining Railway.