After an evening of shooting a few of GLC's units posed for us, we set up one last quick set up. This time it included GLC's latest purchases, GLC 701, 702, 705 SD35's that came from MRL with the ... (more)
The Great Lakes are at record levels and have been for the last couple years resulting in the rivers being well above normal and the Tawas River is no exception. After swapping trains north of tow... (more)
Its around 3am in the middle of know along one of the coolest land locked railroads there is without a sound to be heard besides the wind blowing across the vast openness and the occasional passin... (more)
The sun has long since set on the days of the BMLP but 12 days before the railroad would run their last train, it was business as normal with 3 trains running a day to and from the mine. Here near... (more)
Today August 26th 2019 marks the end of an era that started in 1973 with the construction of the 50,000 Volt electrified Black Mesa and Lake Powell Railroad. Before 0700 local time the last load o... (more)