L469 has nearly reached it's destination as it grinds up the hill towards that Yard Limit board in Oregon.
WAMX 4176 righteously bombs around the curve just West of Lacy Road in Fitchburg.
L469 negotiates the Syene Sag with 21 sand and gravel loads for the Lycon concrete plant in Oregon. This former CNW mainline sat dormant from the late 90's until 2014 when the Lycon facility opene... (more)
WAMX 4176 takes 21 loads of sand and gravel up the grade, and out of Madison on it's way to Lycon's concrete plant in Oregon. It looks as though the WSOR Reedsburg Sub is the dividing line between... (more)
The Wisconsin State Capitol Building stands tall, as L469 makes it's way towards Oregon with 21 sand loads for Lycon.
The only time a train graces these rails is during a storage move. The L469 crew is just coming into Oregon from the East after taking a light engine trip to the end of the line to scout out the f... (more)
WAMX 4176 is heading West between Brooklyn and Oregon, WI. They ran the power all the way to the red board to ensure that the conductor knew exactly where said red board was located, and to check ... (more)
Trains do not typically run on the Reedsburg Sub between Madison and Oregon in the Winter, as the only customer on the line is Lycon, which receives seasonal loads of sand and gravel. This train, ... (more)
L469 heads for Oregon with sand and gravel loads for Oregon, with the Wisconsin state capitol in the background. When WAMX 3947 first showed up on the Wisconsin & Southern, the UP herald was cover... (more)