Brand new light railcar built and designed by Tecnotren to operate in bad track conditions at 60Kph. Today was added another unit making a 3-body vehicle. At the back GE U12 assembling cars to for... (more)
One GE U12 locomotive, waitin few minutes after coupling your consist. The sun falls down and the Moon appear in Concordia`s Station Scene...
waiting for orders at the depot. Note the curved chassis and the hood with signs of a crash. All of this is unfortunately normal to see in most of ALL locs.