Rio Grande Southern 41 crosses the high bridge on its final Durango & Silverton test run before returning to California.
Rio Grande Southern 41 takes its final test run on the Durango & Silverton highline before returning to California.
New Hope & Ivyland 40 approaches Reeder with its passenger train on a cold November afternoon.
New Hope & Ivyland 40 works its passenger train up the grade at Aquetong on a gorgeous November afternoon.
Snow has blanketed the Colorado Railroad Museum's Denver Leadville & Gunnison #191, a Baldwin 2-8-0 locomotive built in 1880.
Valley Railroad 97 waits in the hole at Deep River with NPE1 for the arrival of NPE2 pulled by sister #40. Once the scheduled meet occurs, 97 and train will proceed North. This season is exception... (more)
Granite Point Fresh from a rebuild in Durango's roundhouse, Rio Grande Southern 41 takes a spin up to Rockwood.
Christmastime In Connecticut. VALE 97 (2-8-0, Alco, 1923) is a staple of the Christmas season at the Essex Steam Train & Riverboat, the most prodigious of seasonal tourist train operators i... (more)
Great Smokey Mountain Railroad 1702 muscles back west towards Bryson City.
New Hope & Ivyland 40 simmers outside the New Hope Engine House on a cold October morning. PLEASE NOTE: This photo was taken on railroad property with permission from the railroad. Do not tres... (more)
New Hope & Ivyland 40 rolls through Holicong on a cool fall afternoon.
New Hope & Ivyland 40's crew (Eric Hessler, Nick Nichini, and Paul Nichini) pose proudly in front of the locomotive after its first run of the day.
New Hope & Ivyland 40's crew (Eric Hessler, Nick Nichini, and Paul Nichini) pose in front of the locomotive in New Hope.
New Hope & Ivyland 40 basks in the early morning sun in the New Hope yard. PLEASE NOTE: This photo was taken on railroad property with permission from the railroad. Do not trespass on railroad ... (more)
New Hope & Ivyland 40 charges up the grade as it nears Lower Mountain on a sunny July afternoon.