A loaded limestone and grain train pulled by a Dash-9, BB36-7 and a classic DDM45 passing through Desembargador Drumond station at Nova Era, heading to Vitória.
Interior of the new passenger cars were manufactured by pera Astra Arad, in Romania.
Small train loaded with coal, passing over the bridge near the station Dois Irmãos.
Passengers train delayed two hours by mechanical problems in locomotive BB40-9WM # 1151 that had to be replaced by BB40-9WM # 1175 to continue their journey to the city of Belo Horizonte.
Details of the cabin of the C30-7 and SD40-3MP.
The only daily passenger train that connects two capitals of Brazil, approaching Dois Irmãos station, first stop after from Belo Horizonte.
A small train of tanks led by 3 Dash's 9 switching track on location 78, at the entrance to the yard of Desembargador Drumond.
A big empty grain cars headed by a rare DDM45 passing over the bridge near the station Dois Irmãos.
A loaded train with grain, passing through of Dois Irmãos serving route to the yard of Costa Lacerda.
Locomotive BB45-2 (Ex: ATSF SD45-2) leading a passanger train arriving the Desembargador Drumond station.