Shortly before 5 PM, the illumination of the Langwieser viaduct was switched on. Train 1456 from Arosa to Chur with railcar "Allegra" ABe 8/12 # 3511 is crossing the 284 meter long and 6... (more)
Train 1460 from Arosa to Chur, pulled by "Allegra" ABe 8/12 # 3501, is crossing the 284 meter long and 62 meter high viaduct over the Plessur and the Sapüner creek at Langwies shortly a... (more)
Long-term study of a good 3 1/2 minutes (218 seconds exposure) with the light traces on the cantonal road, the train 4645 on the Bernina line of the Rhaetian Railway from St. Moritz to Tirano and ... (more)
On the Bernina line of the RhB, there isn't a regular hourly timetable, but a limping cadence, as we say in Switzerland. Some trains have a accelerated timetable, the others a strechted one, to ru... (more)
Railcar "Allegra" ABe 8/12 is pulling the long regional train 1617 from St.Moritz to Tirano over the iconic Brusio spiral viaduct. In the rear of the train two BERNINA EXPRESS panorama c... (more)