8061 pilots EMD GT26CW-2 7151 into Wonju whilst working the 1100 from Cheongnyangni to Andong. The electric works the train as far as the limits of the electrification where the diesel takes over.
A express trains leaves with a new locomotive in secunderabad.
WDM3A #18612 of Pune working a pretty late running KR4 Ratnagiri-Dadar Passenger notches up half-way into Kurla station.
The 150-th anniversary of the Petergof railroad.
HXD series are the newest locomotives in China.
A pair of QJ's steam literally and figuratively into the sunset on a fast-moving freight. There were two minutes of daylight left in the deep valley, and less than two years of steam on the reve... (more)
CC20406 leads the way over the high bridge.
The weight of this train was 12,000 tons.
Two QJ's storm upgrade in the horseshoe valley of Erdi.
Switching at Bangkok's principal station. Note crew member in tropical dress.
Steam completely envelopes the train engine as a pair of QJ's blast out of Tunnel 4 on the long slog up to Jingpeng Pass.
Golden Rock WDG3A #14670, working a long tanker rake, waiting for us to cross over near Vallathol Nagar