L863 crosses the nearly 2000 foot long Merrimac Bridge.
WAMX 3947 and 4187 lean into the curve as they drag a decent size train out of the Baraboo River Valley, and up into Devil's Lake State Park.
L469 heads for Oregon with sand and gravel loads for Oregon, with the Wisconsin state capitol in the background. When WAMX 3947 first showed up on the Wisconsin & Southern, the UP herald was cover... (more)
L468 has completed their work at Burke. They're preparing to head West towards Junction A, where they will leave the Watertown Sub and enter the Cottage Grove Sub.
The Wisconsin State Capitol supervises as L468 runs around some traffic at Burke.
L469 has arrived in Oregon, and is in the process of swapping loads with empties at Lycon. This section of former CNW main line sat dormant between Madison and Evansville for about 20 years. In 20... (more)
WAMX 3947 leads Oregon bound L469 across the causeway in Madison.
WAMX 3947 and the L465 job shove a loaded lumber car for Hall Lumber up the Middleton Business Park industrial track.
Some early signs of fall begin to show as WSOR's L465 local makes its return to Madison over the Prairie Sub between Cross Plains and Middleton.
Eastbound L465 local returning from Mazomanie heads through Cross Pains, WI with just two cars.
With the Wisconsin Capitol building looming, another load of aggregate for the brand new Lycon ready-mix plant in Oregon, WI crosses the causeway over Monona Bay. Seeing as the ex-C&NW line from ... (more)