The crew is reassembling the train for pull-pull operational at MP 59. The trip to Riverhead for the Paraco switch will be a quick one. No waiting for the Greenport Scoot at LD Block-Limit.
"WAITING FOR THE SWITCH TO BE CLEANED" RS 60 starting off the day waiting for snow removal by LIRR Work crew. The snow is above the rail head. 18” of snow for this snow storm.
RS 60 heading past the signals that protect movements in and out of the LIRR Ronkonkoma Yard.The signal to the left is ASC CO & eastward manual block and interlocking signal. The signal to the rig... (more)