Yep, its winter in Wisconsin.
With the temperature hovering around the -30 Celsius mark without the windchill, G802 eases through the 25 MPH permanent slow order at the Brule tunnel.
A CN manifest train makes its way south out of Fond du Lac. The train is just starting to make its way up byron hill. The train will be crawling by the time it reaches the top.
A trio of SD70M-2s load a coal train at Coal Valley, AB.
CN 377 rolls through the Brockville VIA Station
CN 8869 leads the daily lumber train out of Jasper and onto the busy Edson Sub.
CN 886 leads a WB mixed freight toward Chicago across these ex-GTW tracks. Note, the BC Rail GE second out.
A new SD70M-2 leads grain empties into Jasper.
CN 8869 and BCOL 4623 arrive at Jasper to receive a new crew.
CN 8869 and BCOL 4623 depart Jasper with M304's train.
Arriving eastbound into Jasper