One of a Westbound parade to receive permission through the CSX CP 293 where CSX works on Sunday evening to replace a switch for the pocket and Baldwinsville Runner on track 2 of the mainline.
UP train MBUWN-02 is seen crossing the 924 foot "New" Chippewa River Bridge in Eau Claire Wisconsin. This bridge was completed in 1912 by the Chicago and Northwestern and it succeed a br... (more)