CPs 8WWA ballast train rumbles over the wooden Crawfish River bridge on a cold and windy spring afternoon. Todays train sports a trio of six-axle EMDs.
Empties at Two Harbors do not leave the way they came in. I believe that's due to the headroom issue at Two Harbors, loads are dumped and then shoved towards an outbound yard. Empties then depart ... (more)
Th BN tested 4 SD60MAC's and then later in 1993 they placed an order for 350 SD70MAC's. The SD60s were the test bed to what became a huge investment in the coal power fleet with the purchase of th... (more)