This was the last day of the 2020 season and train 154 from Oberwald over the Furka pass reached Realp. Now, the cogwheel steamlocomotive HG 4/4 # 704 is pushing the 5 cars of the train into the new built 4-track car shed for the winter brake till june 2021.