On August 10, a northbound freight train derailed in the 57-kilometer-long Gotthard Base Tunnel, and since then both tubes have been closed. All passenger traffic, as well as freight traffic that ... (more)
The two Ge 4/4 II # 620 and # 616 of the Rhaetian Railway in multiple control pull freight train 5154 from Samedan over the Albula line to Landquart freight yard, over the 65 meter high Landwasser... (more)
Inter Regio 1152 of the Rhaetian Railway from St.Moritz over the UNESCO world heritage Albula line to Chur, is crossing the 65 meter high and 136 meter long Landwasser viaduct, landmark of the lin... (more)
Inter Regio 1137 of the Rhaetian Railway from Chur over the Abula line to St.Moritz is crossing the 137 meter long and 35 meter high Schmittentobel Viaduct between Alvaneu and Filisur. Pulling is ... (more)
Rhaetian Railway freight train 5140 from Pontresina over the Albula line to Landquart freight station is actually always the longest. Here, the Ge 4/4 II # 630 and # 631 in multiple control pull a... (more)