On April 19th, 2025, Amtrak P42DC #125, painted in Phase VII, leads southbound Regional Train 147 across the Windsor Locks Canal span of the Warehouse Point (Connecticut River) Railroad Bridge in Windsor Locks, Connecticut on the MRS (Hartford) Line.