A loaded coal train leaves behind CTC signaling as it ducks under the signal bridges at South Littleton on the #1 track. The signal for the # 2 track is for a stack train that will cross over once the coal train has cleared. Although most of the Joint Line is triple track between Littleton and Denver, the #2 and 3 track are usually used to park trains awaiting crews.