The two "Giruno" highspeed trains RABe 501 # 001 and # 004, forming a 404 meter long train, are returning temporarily from the pantograph test runs through the Gotthard Base Tunnel from Erstfeld to Stadler Rails commissioning center Erlen, for repair of the measuring equipment. The train is running through Weinfelden.