CSX N302-10 (Stilesboro,GA-Evansville, IN/EVWR) is now picking up speed passing North-End of Boyce Holdout (MP 132.0 NE Boyce) on the CSX Western & Atlantic Sub after passing a slow order of 25 mph at the Tyner Holdout. The empty Bowen Plant train is on it's way back to the Sugar Camp Mine via of Akin, IL to be loaded with the Illinois Basin black diamond. Three days from now this same train will pass this location heading south loaded for the Georgia Power Plant Bowen, to dump the 98 car train at the plant, even with coal business is still down by 20% as of the first quarter of the 2017 season, it is still an important commodity to it's customers.
GE manufactured safety cab locomotives, refer to https://en.wikipedia.org/wiki/List_of_GE_locomotives for a complete list.
NOTE: This album includes photos of modern GE passenger locos.