While this two levels train from Compiegne to Paris runs on the other track, three indications on the signal :
Z, like Zone, is the place where engineer must obey at the announced speed about half mile earlier.
The yellow light indicates that engineer must have to stop before the next signal if one or two red lights.
One white light indicates the first direction from left on the wye. Right direction on the wye, two white lights.