The first inbound loaded ore train, symbol OT-1, passes through Tunnel #2 on the way to Hayden, AZ. Hayden is the location of the ASARCO smelter, where the copper ore contained in this train is unloaded. Train OT-1 runs almost 24/7 bringing copper ore from the open pit mine at Ray, AZ to the Hayden Smelter.