The trains roll on even through the blizzard that dumped a foot of snow on the area. The previous train was only 30 minutes ahead of it and yet a sizable amount of snow collected on the tracks sin... (more)
Three Engines are viewable, the NSSX 8212 being rebuilt by the New Hope and Ivyland, 2-8-0 40 pulling around connect to the front of the train and GP30 2198 sitting behind the steamer