Mutiple Long Island Railroad MP15s are seen lined up in Port Jefferson's west yard awaiting their next assignment. For multiple weekends in the months of July and August major track rehabilitation... (more)
For two consecutive weekends the Welded Rail Train dropped rail on the mainline between Calverton and Manorville. When crews weren't working, the train was laid up on the Calverton Spur which is t... (more)
The week of April 22nd is the last of the crossing rehabilitation in Riverhead. We see two separate work trains sitting in LD siding, awaiting crews to continue their work the rest of the week.
A 10 car set of Budd M3s is seen pulling out of the pocket track in Massapequa. The pocket track was constructed in 2014 and completed in 2021 for the purpose of turning Babylon line trains that s... (more)
The RS70 crew is seen crossing over from ML4 to ML2 at Queens interlocking sticking with track 2 the entire way to the Central Branch. With RULE 261 capabilities routing for the freights can be di... (more)