Tests are ongoing between this Re 460 from SBB and the new ÖBB carriages. After that the Vectron visible on the left then returns in front of the train composition.
Small shunting tractors in front of an ÖBB Cityjet, which is being used for test runs in Switzerland and provides an interesting background.
Train preparation is in progress moments before the train leaves Erstfeld for test runs in the Gotthard Base Tunnel.
Still going strong. This Re425 will soon perform some test runs between Häusernmoos and Dürrenroth while pulling a new build tamping machine.
Transfer of a tamping machine from Bussigny to Häusernmoos. Here during a short stop so that faster trains can easily pass.
Soon ready to leave Bern northbound.
The composition is back in Switzerland for renewed test runs between Basel, Zurich, Schaffhausen and Singen
This Vectron is based at Frutigen for a short period during testruns in Switzerland.