4449 climbs the side of the bluff over the Columbia Gorge to gain access to the Descutes River Canyon.
Doyle has engine at a crawl for slow order evidenced by supplies staged along sides of tracks.
Lake Yard transfer job approached the throat of Union Station in a sun break between thunderstorms.
4449 slows to a crawl for a slow order for track work with train stretched out in the sun.
GorgeRail weekend group shot caught this train at Crates.
Monster combo Stacks and Racks 9937 feet long.
BNSF Grain train cruises through the gorge striking contrast of angles and curves with the terrain and the arc of the fill.
Accelerating out of the hole from a meet across the single track bridge after meeting a east bound empty grain train.