Do not try to beat the train, these are the consecuences....ALCo 1 - 0 GM
ALCo prime mover 251C being repaired after crankshaft failure. Taken with permission.
Four SD40-2 units bought by MATERFER waiting transport to Córdoba, headquarters of the company. The purpose are to modify the locomotives to Argentina railroad standars, such as lowering weight. ... (more)
ALCo prime mover 251D 1300Hp being repaired after crankshaft failure. Taken with permission.
FIRE! - Little ALCo giving all of herself climbing to Caseros with wet rails. Here we see passing trought El Palomar Station with 47 loaded cars and exausting fire under the surprised eyes of the ... (more)
Only FIAT 7131 Railcar in service in all the nation. Coming soon another unit. Here we see the railcar in service with passenger to Zarate station.
Ex-CP Sorefame EMU running express service from Claypole to constitución.
Crossing "Union Nacional" complex Zarate bound...
Before entering to Mendoza Workshops due to a fire damage, today this beautiful lady is almost done to haul freight, here wee see the locomotive in their last trips before the accident, passing El... (more)
Brand new light railcar built and designed by Tecnotren to operate in bad track conditions at 60Kph. Today was added another unit making a 3-body vehicle. At the back GE U12 assembling cars to for... (more)
Crossing Sarmiento Railway in Haedo.
Roster shot of this beauty after a General Intevention. Just as new...next to the locomotive the load tester car.
Crossing of new Chinese coaches with special diesel service Castelar - Once with ex-RENFE EMD J26 locomotives.
With fire damage waiting being repaired in Concordia Wokshops.