Train #2254 stops at Metropark.
Amtrak's 150 mph (241 km/hr) Acela Express - the fastest train in America! This one was still missing its roof shrouds in August.
The third Turboliner to be refurbished by Super Steel awaits its introduction into revenue service. These trains are designed for 125 mph (201 km/hr) operation, but are currently limited to 110 m... (more)
Amtrak's third refurbished Turboliner rests in the yard, with the first RTL III visible in the background.
An ICE 2 just prior to departure.
GG1 #4859 on display at the Harrisburg station.
The first rebuilt Turboliner arrives as train #251 from New York.