A Union Pacific switch engine from Riverdale Yard pulls a lengthy cut of interchange traffic from the Southern Pacific at Ogden's OUR&D yard on Sept. 17, 1994.
A Rio Grande SD9, a GP9 and a pair of leased SSW GP40s lug a heavy Ogden to Roper SP transfer run south through Salt Lake City.