CSX Y192-12 power is tied down on the switch lead next to the RCO bungalow on the north-end of Wauhatchie Yard. The day shift operator had just got off the RCL and was heading back to the office w... (more)
The pair of SD motor's are waiting on the switch lead to give CSX Q584-02 to double it's train from the 4 pocket to the Yard track 7. Over the years their has been a variety of locomotives assigne... (more)
Preparing to make the shove move back into the yard is CSX Y192-16 with a GP38-2S, and a HLCX GP40-2. Today's modern way of yard switching is RCO, a one man operator on the ground controlling the ... (more)