OCSRR 2-4-4-2 No.7, the Skookum rolls out of Niles Canyon and into Niles Junction, passing NCRR 2-6-6-2 No 4 being serviced during a Pete Lerro Photo Shoot.
The 2-4-4-2 No. 7 The Skookum, rolls out of Niles Canyon into Niles Junction with a Photo Freight during a Pete Lerro Photo Shoot.
The 2-4-4-2 Skookum No. 7 doubleheads with Clover Valley Lumber Co. 2-6-6-2 No.4 and a photo freight opportunity during a Pete Lerro Niles Canyon Shoot
Columbia River Belt Line #7 "Skookum" Leads its Train Past the Sempahore Signals as it makes its way into Sunol Depot During the Golden Spike 150th Anniversary Excursions.
Pulling eastbound up Niles Canyon, No. 7, Skookum rolls through the bridge at Farwell in the heart of Niles Canyon during Pete Lerros Niles Canyon Photo Shoot
No.7, Skookum rolls out of the lower west end of Niles Canyon during Pete Lerros Niles Canyon Photo Shoot
The Engine and Train Crews of 2-4-4-2 Skookum No. 7 from the OCSRR and Clover Valley Lumber Co. 2-6-6-2 T No. 4 of the NCRR pose with their Locomotives after a job well done, during a Pete Lerro p... (more)
The 2-4-4-2 Skookum No. 7 from the OCSRR and Clover Valley Lumber Co. 2-6-6-2 T No. 4 of the NCRR doubleheading westbound out of Sunol during a Pete Lerro productions photo shoot.
The eastbound 2-4-4-2 Skookum No. 7 from Oregon, pulls empty log cars uphill through the heart of Niles Canyon during a Pete Lerro productions photo shoot.
Enroute to Keystone
The crew on No. 7 has a job breifing before beginning the days work.
Black Hills Central No. 7 at the shops after a day of service.