Equipment move to Grand Central Terminal for Rush Hour.
Equipment move of a Maxi Bomb train set to Croton Harmon on track 4.
Next stop Croton Harmon.
An overall dismal day on the CSX side of things was made a bit better when the sun broke through the clouds just in time to get a shot of this Metro North Commuter rail train in front of the bare ... (more)
Metro North GCT MofE crew prepares the Holiday Train for departure to the New Haven Line from Track 27 in Grand Central Terminal. Metro North's Holiday Train runs for two weeks of December of ever... (more)
Heading north along the Hudson River.
Skirting along the Hudson River near Bear Mountain Bridge.
The 201 has the conductor peering out because of a report of RR Crossing failure. Track workers were there to check it out. All trains thru this area had a slow order. The Bear Mountain Bridge is ... (more)
The recent Metro North P32AC-DM rebuilds and repaints look stunning, especially compared to the previous scheme...