Loaded train waiting to go through ore car dumper #1.
The view from inside the cab of BHPb DASH 8 locomotive
BHP taking delivery of new GE AC6000 CW locomotives
Train being loaded at Yandie #2 load out tunnel.
New corporate paint scheme.
Former DME
Loaded iron ore train waiting at Jimblebar Jct. for a new crew to head for the coast at Port Hedland.
645 engine change.
7HDL engine change.
The veiw from inside a GE AC6000 CW passing a DASH 8 powered train.
35,000t loaded Iron Ore train heading to port Hedland on the Mount Newman line in north Western Australia.
Short of power BHPIO have imported SD40/SD40-2 rebuilds.
Empty iron ore train heading to Mining area "C" to be loaded.
Two AC6000 CW awaiting there next assignment.