21 sits by the shop ready for service.
#12 Waits to run down the hill towards Georgetown
Hanging on the side of the hill on the way to Silver Plume
Ex West Side Lumber Co. #8 narrow gauge 3-truck Shay on display in Georgetown.
The former Kahului Railroad #12, a 1929 built Baldwin at Silver Plume depot on Friday before Memorial Day opening. Railstar training trip prior to opening day, May 28th.
Former West Side Lumber 3-truck Shay on display at the Old Georgetown Station.
I climbed the rugged south side of Clear Creek Canyon and found an opening in the trees. Georgetown Loop 40 crossed the 300-foot long Devil’s Gate High Bridge on the last day for operator Georg... (more)
Krystal, 5 years old, waves farewell to the Georgetown Loop train. The current operator finished their season Oct. 3, 2004 and will be replaced by Railstar. They operated the Loop trains from Au... (more)
Georgetown Loop #40 is shown with Devils Gate Viaduct in the background. After making a looping climb, the train will cross over these tracks on the bridge..
Georgetown Loop #40 crosses Devils Gate Viaduct.
GLRR 40 climbing up to the Devil's Gate station
Going over the loop.