DMIR 408 pulls its train across the proctor scales.
The conductor sets the switch for the inbound taconite loads.
Ore loads for Escanaba depart the Twin Ports.
Loaded taconite shuttle heads for the Fairlane processing plant with 77/6..
The 07:00 Proctor Roadswitch arrives at Dock 6 with 140 cars of iron ore. Minus 13F with a wind chill of minus 40F.