Spring has sprung. Two GE's drag a lightweight baretable train East up the challenging Tehachapi Pass on a beautiful Spring afternoon. Lupine is in bloom, on top of Tunnel 2.
"Amtrak 727, Diverging Clear at Niles" is what engineer Ken Hence says over the radio, as he sets some air and brings it down to the 10MPH speed to cross the diamond, at Niles.