With the milling units extended to a width of 6 meters, the skidding composition from Pontresina with the Xrot mt # 95404 pushed by the diesel locomotive Gmf 234 # 03 clears track 2 in Alp Grüm.
Winter came back on the Berninaline in mid march. "Ancestor train" (Ahnenzug) ABe 8/12 # 3514, with the railcar in the colors of the former Chur-Arosa Railway in front, is entering Alp G... (more)
Winter came back on the Berninaline in mid march. The Rhaetian Railway snow clearing train from Poschiavo is on its way back to the depot and arrives at Alp Grüm, coming from Ospizio Bernina. The... (more)
Winter came back on the Berninaline in mid march. "Allegra" ABe 8/12 # 3504 of the Rhaetian Railway enters Alp Grüm station in the blue hour at 6.27 PM (delayed 45 minutes) with the Reg... (more)
Winter came back on the Berninaline in mid march. "Allegra" ABe 8/12 # 3504 of the Rhaetian Railway reached Alp Grüm with the RE 1625 of the line RE9 from Pontresina to Tirano. This day... (more)