The New River Train, P937 leans into a curve, kicking up dust from newly dropped ballast on its way into Hinton, WV for the annual "Rail Days" celebration.
An Eastbound departs the yard office in Hinton. The pipe structure was used to fill the C&O E units with water, for steam generated heating on passenger trains. A 45 second exposure @ f8.0, ISO ... (more)
A return to a time when passenger trains ran on schedule, and a drowsy kitten carried the advertising load for the C&O Railway. The drum head of the restored PV Chapel Hill, on the rear of the Ne... (more)