With a Bessemer & Lake Erie tunnel motor and a CN Anniversary Dash 8 on the point, CN U731 rounds the bend as it comes off the main on the Missabe Sub and on to the lead into the Fairlane Taconite... (more)
Sitting. Waiting. Patience. A work block in between them and their destination is providing a time to sit and relax until things clear up and traffic moves allowing them to move. Eventually.