While a Westbound BNSF stack train waits, CP 198 continues to pound the diamonds at Soo Tower and now has begun to tiptoe through downtown Minot, passing the Soo Line Depot on North Main.
The engineer of a 6700 foot Logistics Park, IL bound stack train throttles his SD75 duo up for the pull over the last hill before the 22 mile downhill trip into Minot.