Dundas Peak dwarfs VIA 6414 as it heads straight into the sunset with Train 83.
CN 5302 leads CN 317 a dimensional extra up grade through Dundas. 317 comprised of 2 empty ballast cars and the D7 load.
CN 435 is climbing Dundas Hill.
CN 4725 leads the joint CN-Southern Ontario Railway steel bound for Nanticoke.
CN 411 grinds up the 1% climb to Copetown at about 8mph... If only pictures had sound!
VIA 73 sprints up the Dundas hill at 60 miles per, 6420 features one of 2 third headlight units.
GCFX 6042, CN 6018 drag all 7100tons of 393 up the Dundas grade, with .7 HPT no wonder he was crawling!
The westbound "International", with the Niagara Escarpment in the background.
VIA 6404 rounds the bend about halfway up the Niagara Escarpment at Dundas, MP 4.7 on its namesake subdivision.
CN 5771 and DWP SD40 5904 crawl up the Niagra escarpment at Dundas.
VIA 6413 painted up in the Spiderman 2 scheme blasts thru Dundas bound for Windsor.