The train has descended to Caliente and is coming through the loop. Dash 9 4673 is headed west bound toward Bakersfield with the sun breaking out and good light for photography. Locomotive 4673 is... (more)
Dash 9 4753 is the first engine in the Mid train DPU set. The train is descending through the Caliente loop and will soon round through the loop’s horseshoe curve. There are a lot of very full g... (more)
This is the heaviest and longest train to run on the BNSF Transcon and Tehachapi lines. It is the 17,000 ton grain train. It typically runs 9 Engines in three sets, lead, mid and rear. Dash 8 871 ... (more)
Dash 9 4491 leads an eastbound through the BNSF Transcon switches for the Peavine Branch to Phoenix. The Branch is over a hundred years old and Phoenix 140 miles away. The branch was originally bu... (more)